Eagle Scout Projects

Leadership, planning, and service to others through trail conservation and community projects

Featured Eagle Scout Projects

Eagle Scout project - Trail maintenance and erosion control

Trail maintenance and erosion control project completed by Eagle Scout candidate

Trail Conservation Project

This Eagle Scout project focused on constructing water bars and implementing erosion control measures along a critical section of the Red Trail. The project helped maintain trail integrity and prevent environmental damage during heavy rainfall.

Scout: John Smith

Date: Summer 2024

Hours: 120+ service hours

Eagle Scout project - Information kiosk construction

Information kiosk constructed at trail head by Eagle Scout candidate

Trail Information Kiosk

An Eagle Scout candidate designed and constructed an information kiosk at a popular trail head. The kiosk provides valuable information to hikers including trail maps, safety guidelines, and local wildlife information.

Scout: Michael Johnson

Date: Fall 2024

Hours: 150+ service hours

Project Gallery

Eagle Scout project - Elevated trail section over wetland

Elevated trail section constructed to protect sensitive wetland areas

Eagle Scout project - Trail signage installation

Trail crossing signs installed for emergency location identification

Eagle Scout project - Bridge construction

Small bridge constructed to improve trail accessibility

Types of Projects Available

Trail Conservation Projects

Construct water bars to eliminate erosion along the trails. These projects help maintain trail integrity and prevent environmental damage.

  • • Water bar construction
  • • Erosion control measures
  • • Trail maintenance and repair
  • • Drainage improvements

Road Signs at Trail Crossings

Adding street signs at trail road crossings helps hikers locate their position on the trail. Especially helpful when there is an emergency and EMS has to be called.

  • • Sign design and fabrication
  • • Installation at trail crossings
  • • Emergency location markers
  • • Trail identification signs

Kiosks at Trail Heads

Construct kiosks at the start of trails with information about the trail. These provide valuable information to hikers and visitors.

  • • Information board construction
  • • Trail map displays
  • • Safety information posting
  • • Educational content

Elevated Trail Sections

Elevate a section of trail that traverses a swampy area. These projects improve trail accessibility and reduce environmental impact.

  • • Boardwalk construction
  • • Bridge building
  • • Elevated walkways
  • • Wetland protection

Past Projects

Trail Maintenance Projects

Multiple Eagle Scouts have completed trail maintenance and erosion control projects throughout the region.

Information Kiosks

Several information kiosks have been constructed at trail heads to provide valuable information to hikers.

Trail Signage

Road signs and trail markers have been installed at various trail crossings and intersections.

Eagle Project Process

1

Project Planning

Develop a comprehensive project plan including scope, timeline, and resource requirements.

2

Approval Process

Submit project proposal for review and approval by troop leadership and project beneficiaries.

3

Project Execution

Lead the project implementation with proper supervision and safety measures in place.

4

Documentation

Complete project documentation including photos, reports, and beneficiary statements.

Get Started with Your Eagle Project

Contact Information

For details about available projects or other suggestions, please contact our Eagle Project coordinator.

Contact for phone number

Volunteers Needed!

The Red Trail Wanderers are always looking for new members. Want to get involved in leading hikes? Help maintain our trails? Develop trail guides? Get scouts involved in hiking? Network with others in the Catskill region? - Then join us.